QUALITY / SEVEN CHECKPOINTS
Quality Control Through the Project
Verification activities are planned alongside the tooling structure, process path and release requirements.
Discuss a requirementCONTROL PATH / SEVEN-STEP SEQUENCE
Checks connected from structure to release
The sequence below reflects the client-provided quality path. The exact method and acceptance basis remain project-specific.
The final checkpoint maintains traceable quality records through delivery without adding unsupported third-party credentials.
See workshop contextStructural simulation analysis
Review structural behavior before manufacturing decisions are finalized.
Raw material inspection
Confirm incoming material against the approved project requirement.
Stress relief heat treatment
Plan stress-relief processing where the selected material and structure require it.
Strict tolerance control
Control critical dimensions through machining and intermediate checks.
CMM precision calibration
Verify defined datums and dimensions using suitable inspection methods.
Finished product assembly test
Review fit, access and intended operation before release.
Traceable quality records
Maintain project inspection and verification records through delivery.